Guyana and Suriname Target Year-End Talks to Advance $236 Million Corentyne River Bridge
COUNTRY:GUYANA / SURINAME.
Guyana and Suriname are working to schedule another high-level meeting before the end of the year to advance discussions on the proposed US$236 million Corentyne River Bridge, which would establish a direct road link between the two neighbouring countries. President Dr Irfaan Ali said on Friday that efforts are underway to arrange the bilateral meeting, which is expected to take place in Guyana.
The proposed 3.1-kilometre bridge would connect Moleson Creek in Guyana with South Drain in Suriname. Bilateral discussions on the project advanced following the signing of a memorandum of understanding between the two countries in 2020.
President Ali stated during a press conference in Georgetown . He also noted that the contract for a separate new high-span Berbice River Bridge is expected to be awarded before the end of 2026, with technical evaluation and financing structuring currently underway.
The Corentyne River Bridge is viewed as a key infrastructure project for regional integration, linking Guyana and Suriname and potentially facilitating broader trade connections with northern Brazil. The project has attracted interest from international contractors, with China Road and Bridge Corporation selected as the preferred builder by both governments.
For the Caribbean and South America, the bridge represents a concrete step toward deeper cross-border cooperation and economic integration, reducing reliance on ferry services that currently handle passenger and cargo movement across the river.





